Tbilisi (GBC) – According to the statement of the General Director of Georgian Railway, Lasha Abashidze, the funds saved as a result of the ongoing optimization in the company will be used to renew the wagon and locomotive fleet. For this purpose, Georgian Railway announces an electronic tender for the purchase of 120 freight gondolas.

“The tender announced for the purchase of freight gondolas is the first result of the optimization carried out in the company - Georgian Railways plans to purchase the wagons with the saved funds. It is worth noting that a large part of the existing wagon and locomotive fleet is outdated in terms of technical parameters and condition and requires renewal/modernization. We will work actively for this purpose. This initiative is aimed at optimizing the transport and logistics direction of Georgia and increasing its throughput, as well as the efficiency of the railway,” Lasha Abashidze noted.

It is worth noting that the addition of gondolas is critically important for the wagon fleet of Georgian Railways due to the high demand for them, gondolas are important in the working process of local production.

According to the tender documentation announced by Georgian Railway, the service life of the wagons has been determined to be at least 22 years, and the design speed should not be less than 120 km/h. It is also important that the proposed wagons will be built no earlier than 2025, should not have been in operation and should not have participated in loading/unloading operations. In addition, the wagons should be able to carry at least 69 tons of cargo.

The estimated cost of the purchase is 20,142,312 GEL. The tender will start on December 10, 2025 and end on December 12.